STANDARD
TURN-KEY PACKAGE
A “KEY HOMES” CUSTOMER CAN BE CONFIDENT THAT QUALITY IS A STANDARD, NOT AN OPTION!
FULL BASEMENT
- 12 courses high, 10″ block walls
- Egress Window per code
- Core pours every 4′ with vertical rebar
- 3″ FHA approved adjustable jackposts
- 4″ perforated drain tile on the inside & outside of the footers w/ #2 washed stone over the top
- Filter wrap over outside drain tile
- 4″ reinforced concrete floor with sealant
- Vapor barrier under concrete floor
- #2 washed stone under the concrete floor
- Crock with either sump pump or natural drain
- 4 vinyl thermopane glass basement windows with screens
- 2″ x 10″ pressure treated sill plate with sill seal
- Fiberglass coat & tar coat for dampproofing outside wall
- Basement steps with handrails
- Stamped basement prints
BASEMENT INSULATION
- Blanket Wall Insulation per code
EXCAVATION
- Digging Foundation, Backfilling and Rough Grade
*(Final grade and seeding is customer’s responsibility)
DRIVEWAY
- Stone Driveway – 12’ x 100’, with a Two Car Turn Around
*(Approx. 1600 sq. ft.) (Culvert pipe & state highway permit
NOT included, if necessary)
SEPTIC SYSTEM
- 1,250 Gallon Concrete Tank w/ 250 Feet of Leach Lines
*(Perk test and engineered septic / site plan is customer’s
responsibility)
*Turn Key Package can be adjusted for municipal sewer line
HEAT / VENTILATION SYSTEM
- 95% High Efficiency Forced Air Heat w/ Metal Duct Work
- 40 Gallon Gas Direct Vent Water Heater
*Either Natural or LP Gas
- Whole House Ventilation System per code
- Blower Door Test w/ Certified report
*Central Air Conditioning is optional
ELECTRIC
- 100 Feet of Overhead Electric Service
- All cross-overs & tie-ins to panel box
- 2 outside GFI protected receptacles
- 4-6 lights & 4 sets of GFI receptacles in basement
- Meter, riser & weatherhead
- Electrical inspections
*Underground electric is optional
WELL PUMP PACKAGE
- Pump, Trench, Water Lines, Pressure Tank & Cartridge Filter, Electric & Limit Switches
(Drilling & Well Casing is customer’s responsibility)
*Turn Key Package can be adjusted for municipal water line
PLUMBING
- Plumbing Connections & Tie-Ins in the basement
STEPS
- Two sets of Exterior Steps
GUTTERS
- Seamless Aluminum w/ Downspouts, Tails & Runners
NOTE: Actual sitework costs will vary based on lot situation, distances off the road, options, etc.
ALSO INCLUDES:
Delivery of House | Setting House (Including Crane & Crew) | Stamped House Prints | NYS Approvals (Labels & Seals)
Flooring Installed |Exterior Sided | Interior Trim & Finish Work | House Cleaned
Garbage Removed from Construction Site |Full Time Production Staff to Oversee Construction
Full Time Service Department
OPTIONS COMMONLY ADDED:
Garages | Porches | Decks | Outside Basement Entries | Fireplaces
What are the
BENEFITS OF MODULAR HOMES
cost-effectiveness
Modular homes are generally less expensive to build compared to traditional site-built homes due to lower labor costs, shorter construction times, and the efficient manufacturing process. This can provide significant savings on overall housing costs.
FAST CONSTRUCTION TIMELINE
Since modular homes are built in a controlled factory environment, construction can be completed more quickly than traditional homes. The modular sections are constructed simultaneously with site preparation, leading to faster delivery and installation.
ENERGY EFFICIENCY
Modular homes are often built to high energy efficiency standards. Many come equipped with modern insulation, energy-efficient windows, and HVAC systems, which can help reduce utility bills and improve overall comfort.
QUALITY CONTROL
The factory setting allows for rigorous quality control measures during construction, leading to more consistent quality and fewer construction errors than might occur with site-built homes. This controlled environment also minimizes the impact of weather delays.